Thursday, September 25, 2008

High Energy

Setting up stream gauging at the Gold River site has been challenging. The stream is very high-energy and not a good site for a traditional post with gauge and PVC tube stilling well. the budget does not allow for a creekside well gauge as WSC typically uses. So, we had to get creative.

I brought my Bosch Annihilator powerdrill along and after some searching, found a relatively vertical rock face to bolt a 1.8m steel ruler to to serve as a staff gauge. Whether it will last through the winter storms in questionable, I am looking forwards to seeing if it can withstand high water loaded with moving boulders and LWD.

Next up was the installation of the pressure transducer and again it was bolting time. We took a small boulder, placed a bolt and zap-strapped the transducer to the bolt. Then I put the whole mess in the creek in a pool sheltered behind a bedrock section of the channel and built a little hutch of other small boulders around it and capped with a large flat rock. Hopefully it will be protected there. If not, we have a backup transducer ready to install.

Finally we did some salt dilution gauging. There are a lot of pools so this was challenging. First test, with 1 kg of salt over 35m of channel, got a conductivity peak of 90 μs/cm after 10 minutes or so and had not returned to background levels after 40 minutes. Second trial, with 2kg of salt over 15m of channel, got a peak of over 400 μs/cm and was back almost to background after 20 min.

Transducer